16-10
OPTIONAL ACCESSORIES
SM DNGRPM 1-E.4 GB
Fig.7
● Arrange the wires and capillary tube together
with plastic ties, don’t fold or break the capillary
tube,keep a large loop for extra length of capillary
tube.
● Check for refrigerant leaks.
Fig.8
● Re-assemble the previously removed elements.
● Verify the wiring to electrical diagram.
Comments to this Manuals